Scope:
The scope of this project was for the CONSOLIDATED AIRCRAFT SUPPORT SYSTEM (CASS).
- Provide personnel, equipment, and materials to perform the following testing on the CASS.
- Hi-pot testing of the 960V/400Hz system
- Continuity testing of the 28V/60Hz system
- Continuity and insulation testing of the 480V/60Hz system